Wire Mesh Fence Painting Spraying Line
Payment Terms: |
T/T,L/C |
Place of Origin: |
Hebei, China (Mainland) |
Product Detail
Model No.:
ZaM14083
Production Capacity:
5 sets each month
Delivery Date:
10-15days
Rising Stage:
Room temperature for 1-2 mi...
Powder curing:
180-200 Celsuis for 20 mins
Means of Transport:
Ocean,Land
Packing:
In bulk
Item Description:
Fence Powder-coating Line
Surface conditioning stage:
Room temperature for 1 minu...
Operation:
Automatic
Conveying speed: 1.3m/min (Adjustable control)
Output: 45-90pcs per hour
Heating source: natural gas (Other choices available: electricity, oil)
Design description of mesh fence powder coating line
1. According to the shape of welded wire mesh, we design the pretreatment to be economical immersion tank type with 6 stage processings.
2. After chemical cleaning, he pre-treated workpieces will be conveyed to drying furnace for water removal on their surface. The drying furnace is designed being tank type to match with immersion pretreatment tanks, and with a top-door design for easy access of pre-treated workpieces.
3. After drying, the workpieces are ready for powder particle adhesion. Please manually feed them on auto powder painting line. For a better painting result, the spray booth, waster powder recycling system, reciprocator adopts advanced equipments in China through our careful selection. And the spraying guns, both auto and manual are imported from foreign famous company for a longer service life. Then these workpieces will be sent to gas-fired furnace tunnel to let powder melt into a smooth coating.
Process flow for mesh sheet powder coating line
1. Feed your welded wire mesh on this automatic powder coating line
2. Pre-degreasing stage (50-65 Celsuis for 1 min)
3. Degreasing stage (50-65 Celsuis for 2 mins)
4. Rinsing stage (Room temperature for 1-2 mins)
5. Surface conditioning stage (Room temperature for 1 min)
6. Phosphating stage (35-45 Celsuis for 3 mins)
7. Rinsing stage (Room temperature for 1-2 mins)
8. Drying off oven to remove surface moisture (100-120 Celsuis for 10 mins)
9. Manually transfer the pre-treated objects to powder coating line
10. Powder application with spray guns
11. Powder curing (180-200 Celsuis for 20 mins)
12. Finished product discharging
If above parameters cannot meet with your strict coating need, please contact us for more detail. We can make some adjustments or even improvements to suit your actual production conditions.
Didn't find what you're looking for?
Post Buying Lead or contact
HiSupplier Customer Service Center
for help!
Related Search
Find more related products in following catalogs on Hisupplier.com